Top
image credit: Adobe Stock

STADLER delivers continuous improvement at J&B Recycling dry mixed recyclables plant

STADLER’s relationship with J&B Recycling began in 2008, when it designed and built its dry mixed recyclables plant in Hartlepool, United Kingdom. It has remained at their side ever since, supporting the company in a continuous improvement process of the plant. “We continually improve the plant, and our focus is producing the best quality material possible,” says Matt Tyrie, Operations Director at J&B Recycling.

A flexible design for consistently high purity rates

The composition and density of dry recyclable waste is in constant evolution.

Read More on Waste Management World