Electric Utility, Public Utilities
January 26, 2022
Via: Power Engineering InternationalThe company said 73 of Blue Canyon II’s 84 turbines were repowered, along with each turbine’s nacelle, blades and top tower section. The turbines were upgraded from V80 1.8 MW machines to V110 2 MW machines from Vestas. One of […]
May 10, 2023
May 10, 2023