Smart Grid

Can Grid-Forming Inverters Safely Power the Digital Grid?
Energy Management Can Grid-Forming Inverters Safely Power the Digital Grid?

Scientific evidence is needed to bridge the gap between the performance claims made by battery manufacturers and the strict safety requirements of utility operators. As power grids worldwide undergo a fundamental transformation from fossil fuel-based generation to renewable energy, the reliance on

AI-Driven Project Optimizes EV Charging Across Europe
Energy Management AI-Driven Project Optimizes EV Charging Across Europe

In rural Denmark, researchers are implementing battery energy storage systems to provide high-speed charging in areas where the existing grid infrastructure is traditionally weak. This pilot program serves as a foundational blueprint for a broader European strategy designed to equalize access to

How Can Quantum Computing Transform the Utility Sector?
Energy Management How Can Quantum Computing Transform the Utility Sector?

The commercial tipping point for quantum computing is projected to generate between $1 billion and $4.4 billion in revenue by 2028 with trillions in economic value possible by the 2030s. This massive influx of capital reflects a fundamental shift in how the utility sector approaches disruptive

How Will New Jersey’s Virtual Power Plant Proposal Work?
Energy Management How Will New Jersey’s Virtual Power Plant Proposal Work?

Utility companies including PSE&G and JCP&L will eventually verify the performance of residential batteries to determine the appropriate incentive payouts. As New Jersey accelerates its transition toward a decentralized energy landscape, the Board of Public Utilities has introduced a framework that

Judges Recommend Rejection of Massive Texas Power Line Project
Infrastructure & Technology Judges Recommend Rejection of Massive Texas Power Line Project

The proposed Bell County East to Sand Lake transmission project faces a major setback after judicial findings questioned the actual necessity of the multi-billion dollar infrastructure. This massive 200-mile venture, spearheaded by Oncor and the Lower Colorado River Authority, was designed to be

PJM Interconnection Reforms Aim to Speed Up Grid Access
Infrastructure & Technology PJM Interconnection Reforms Aim to Speed Up Grid Access

Battery storage has emerged as the primary beneficiary of surplus interconnection because it can discharge electricity during the hours when a co-located generator remains idle or operates at low levels. This strategic advantage comes at a critical time for the PJM Interconnection, which oversees

Loading

Subscribe to our weekly news digest.

Join now and become a part of our fast-growing community.

Invalid Email Address
Thanks for Subscribing!
We'll be sending you our best soon!
Something went wrong, please try again later